ROCK ELECTRIC RECENT AND CURRENT PROJECTS

DESIGN- BUILD

KEMIA

@ Oberlin Science Center

Tissue culture, chemistry, pharmacology, and wet laboratories and NMR and corporate office space

DESIGN- BUILD

PHENOMIX

@ Oberlin Science Center

VIVARIUM, tissue culture, chemistry, pharmacology, and wet laboratories and corporate office space
DESIGN- BUILD

SONY SCEA

@Barns Canyon Facility

Worlds largest motion capture studio.

DESIGN- BUILD

DESIGN- ASSIST

BIOGEN-IDEC Expantion of Lab facilities including. new Wet labs, and Bioreactor lab.
DESIGN- BUILD

PRIMAPHARM

@ Oberlin Science Center

PrimaPharm, Inc. is a high quality, specialty contract manufacturer of an array of pharmaceutical products. This was a cGMP project
ALL STAR SERVICES
DESIGN- BUILD COAST GUARD SECURITY Lighting and intrusion detection part of home land security upgrades
  TRUCK HOLDING YARD Grounding system for
CAMP PENDLETON, CA
DESIGN- BUILD BPA Spec Lab Spec Wet Lab and office spece
  Tioga Hall Tioga hall is an 11 story renovation with a new fire alarm system, all new devices, upgraded electrical in bath rooms and lighting through out the building.
  Mar Vista  
  OR Abatement  
  Digital Chest  
Cox Construction
  SR125 Operations Center Phase ll Opperations Center and Toll Booth on State Route 125
DESIGN- ASSIST Encina Operations and Maintenance Facility  
     
DESIGN- BUILD

ARMY (OMF) Operational Maintenance Facility

 
DESIGN- BUILD Navy Seal Training Barracks Four-story major remodle of the Navy Seal Training Barracks at Coronado Island.
DESIGN- BUILD San Diego Central Police VMF Two-story main building and One-story Comunity center comprised of 28,000 square feet on approximately 2.36 acres. Features include a fuel station, an oil lubrication site, and a vehicle wash bay.
DESIGN- BUILD

County Animal Control Facility

Winner of the 2002 Orchids Awards

Animal Care Facility serving all of San Diego County, The bright, attractive, state-of-the-art facility, located at 5480 Gaines Street, was made possible with the generous donations of Joan Kroc and Helen Copley, as well as many other people, and with City and County funds. Design features include, energy efficient lighting design. 80 KW emergency power generation, medical exam and treatment rooms.
DESIGN- BUILD Qualcomm Stadium Accessibility Upgrades Stadium Addition with 5 new elevators, wheelchair lifts and first aid station. Emergency power generation.
  Hanger #4 Renovation Repair and addition of new mechanical cleanrooms, 28 Volt power rectifier system and power distribution systems.
DESIGN- BUILD Waste Management Headquarters Facility 40,000 Sf Facility Including Administration building, Maintenance buildings, Fueling station with underground fuel storage and service garage and 9.04 acre site.
  Gas Station Car Wash New self-service gas station and car wash with detached quick mart convenience store. Water reclaim system and high pressure pumping system.
     
Harper Construction Co
DESIGN- ASSIST Maranatha High School  
  Corner Stone Church  
  New Hope Church  
DESIGN- BUILD Liberty Station Building 195, 6 and 7 Historic remodel of the NTC core
  Los Alamitos MOB III 3 story medical office building
  Glendale Memorial Hospital X-ray Room and Orthopedic suites
DESIGN- BUILD Navy Lodge Addition at 32nd street Naval Station A single 4-story project resembling a private sector hotel, which Included administration offices, 104 guestrooms, laundry facilities and access control.
  Location Exchanges MCP Camp Pendleton, CA. Includes three (3) identical, single story buildings resembling a "mini-mart". Each building is approximately 6,870 sq.ft., with masonry exterior walls and a metal roof. Each building is located at a different site at Camp Pendleton. The three sites are within about a 10-mile radius.This retail facility is designed to include a coin-operated laundry, a barber shop, a retail sales area, a video rental, a heat n' eat, dry cleaning pick-up and drop-off, offices, storage and dock areas.
DESIGN- BUILD

Navy Lodge Complex NAS North Island, , Coronado, CA.

 

Awarded a Southwest Division Award for Outstanding design

A single multi-story project resembling a private sector hotel, which Included administration offices, 102 guestrooms, laundry facilities. Received a rare overall rating of "Outstanding" on the owner's final Performance Evaluation registered with the Army Corps' CCAS database. Total Square Footage: 79,748 Sf.
DESIGN- BUILD USPS Airport Mail Facility Design-Build Major renovation of main air mail faculty, inclined mail processing conveyers and mail reading equipment.
DESIGN- BUILD Renovate Bowling Center NCBC, Port Hueneme, CA. Design/Build contract. Design-Build renovation and expansion of an existing Base Bowling Center. Included the interior remodel of restroom facilities, snack bar, mechanical systems, bowling lanes, and automatic scoring equipment.
  Child Development Center Naval Training Center, San Diego, CA. A complete childcare center with classroom buildings with a distinctive Spanish-style architecture and complete toddler recreation areas. Included individual classrooms, eating areas and a service kitchen. Total Square Footage: 22,000 Sf.
DESIGN- BUILD Maranatha Chapel Complex Three buildings including a Sanctuary, a Classroom Building and a Fellowship Hall, with parking for 750 vehicles. The Sanctuary Building is approximately 43,000 square feet and features an impressive glass foyer, and a 3,000 seat main chapel room with open ceiling, and numerous offices, a conference room, and a study. The interior features olive wood and Jerusalem stone for an old world look. The Classroom Building is an 18,187 square foot, two-story structure used to accommodate Sunday School and Bible Study classes. The Fellowship Hall is a 9,720 square foot, single-story, multipurpose room. Total Square Footage: 75,000 Sf.
DESIGN- BUILD Naval Reserve Center NCBC, Port Hueneme, CA. The project is made up of a single-story, 16,000 square foot Type V building, including an assembly hall, classrooms, storage rooms, public restrooms and administration areas.
DESIGN- BUILD Verano Housing Design-Build Digital fire alarm system upgrade to 862 unit verano housing complex at UC, IRVINE
DESIGN- BUILD General Warehouse

NCBC, Port Hueneme, CA.

90,042 square foot, Butler warehouse. This project utilized an innovative application of pre-engineered design and construction.

DESIGN- BUILD Sealift Support Facility NCBC, Port Hueneme, CA. a concrete tilt-up warehouse facility used for large-scale shipping and receiving. We received a specialized "Pallet of Excellence Award" from the Base Commander. Total Square Footage: 120,000 Sf.
  Calipatria State Prison Renovations to Bid-pac 5 including maintenance shop, communication center, and level I housing.
  Scripps Miramar Ranch Branch Library A complete community branch library, including Spanish Revival Style Architecture with meeting and support facilities designed to support local community group activities. Total Square Footage: 22,000 Sf.

C.E. WYLIE

  Spawar Clean rooms

Class 10, 100, and 1000 cleanroom facility

EMS, central chiller plant, switch gear upgrade

MISC PROJECTS
  NOVARTIS GENERAL MAINTENANCE
DESIGN- BUILD BIOGEN-IDEC Temp Chiller
     
     
     
     
TRIANCO, INC.
  Commissary POS Upgrade, North Island

All projects complete replacement of existing POS system and cash wraps. Work was extremely time sensitive and required 24 hour shift work.

 

  32nd Street
  Camp Pendleton
  March AFB
  Imperial NS
KENAI CONSTRUCTION
  Thornton Hospital Stem Cell Lab in operating hospital
DESIGN- BUILD Mayer Hall at UCSD Presentation and multimedia room.
DESIGN- BUILD Signal Pharmaceuticals 10,000 sf tissue culture, chemistry, pharmacology, and wet laboratories tenant improvement. 34,000 sf screening and robotics laboratories tenant improvement. 80,000 sf renovation to accommodate chemistry, tissue culture, pharmacology, wet laboratories and corporate office space
DESIGN- BUILD Oncosis 12,000 sf wet lab, cancer research facility.
DESIGN- BUILD Graviton 24, 000 sf research and development laboratory expansion. Electronics lab
DESIGN- BUILD Valigen 15,000 sf plant science research laboratory and greenhouse
DESIGN- BUILD Sequenom 15,000 sf wet lab, BL2, tissue culture lab class 10,000 cleanroom
DESIGN- BUILD Optimer 11,000 sf wet lab, BL2, tissue culture lab
DESIGN- BUILD Dermatrends 4,500 sf wet lab, BL2, tissue culture lab
DESIGN- BUILD Trilink 2,000 sf tissue culture, chemistry and wet lab tenant improvements.
DESIGN- BUILD Imunogenix 7,000 sf wet lab, BL2, tissue culture lab
DESIGN- BUILD Activx 6,000 sf tissue culture, chemistry, and wet laboratories tenant improvement.
DESIGN- BUILD GenStar Therapeutics Design-Build cGMP pilot mfg. Facility for gene therapeutic product
DESIGN- BUILD Nancy Ridge LLC Tenant improvements for 42,000 sf multi-tenant wet lab research facility
DESIGN- BUILD Novatel Wireless, Inc. 4,000 sf corporate office remodel and battery test room.
DESIGN- BUILD Scripps Orthopedics Center 6,000 sf Prosthetics research facility
DESIGN- BUILD Genway 4,500 sf of wet lab and office space
R.P. RICHARDS CONSTRUCTION
DESIGN- BUILD Reverse Osmosis Purification Plant Water purification Facility. Work included PLC and Hi-Voltage splicing.
PACIFIC ALLIANCE
  Warehouse Repair and Modernization 3 Warehouse renovations, lighting, power and high speed communication
DESIGN- BUILD Relocate Main Computer Room Relocation of main computer room and associated power and networking
DESIGN- BUILD

Micro Constants

@Pacific Sorrento Tech. Center

4,500 sf wet lab, BL2, tissue culture bio analytical, drug metabolism and pharmacokinetic support labs
DESIGN- BUILD

Q3DM

@Pacific Sorrento Tech. Center

5,000 sf wet lab, BL2, tissue culture lab.
DESIGN- BUILD Maxima Corp lab office
  Anne's Alley This project involved historic restoration of four existing structures located in the Fort Rosecrans Historic District at the Point Loma Submarine Base in San Diego, California. Project structures were part of approximately 41 buildings designated as California's Registered Historical Landmark #62
 
DESIGN- BUILD Gymnasium Gymnasiums, Weight room, Racquetball courts. basket ball courts, included single story with mezzanine on a concrete slab on ground with bearing masonry walls.
  Helicopter Outlying Landing Field High Voltage service relocation and pump station. The 3,000-foot-long, 100-foot-wide field was built to handle 430 helicopter takeoffs and landings a day,
CASS CONSTRUCTION, INC
  BRISBANE SEWAGE LIFT STATION
  SAN ELIJO HILLS PRESSURE REDUCIING STATION
  HIDDEN TRAILS SEWAGE LIFT STATION
J.FLETCHER CREAMER
  LA MESA SWEETWATER EXTENSION & UPPER
RESERVOIR PIPELINES MODIFICAITONS
SWEETWATER PIPELINE
MODIFICATION
OTAY WATER DISTRICT, CA
ORION CONSTRUCTION
  UNIT W-2 EXTENSION POWER & TELEMETRY
  SAN PASQUAL MISSION BAND OF INDIANS VALLEY CENTER, CA BOOSTER PUMP STATION
  OTAY 14 FLOW CONTROL FACILITY FLOW CONTROL FACILITY
  MISSION CITY PRESSURE REDUCING STATION PRESSURE REDUCING STATION
 

Last Update August 4, 2006

ROCK ELECTRIC INC. 7950 Silverton Ave. Suite 211 San Diego, CA. 92126